Complete Infrastructure

Built for Industrial Excellence

Lion Industrial Park provides end-to-end infrastructure so tenants can focus on production. Every utility is independently metered, maintained to international standards, and scalable to your operational demand.

Water Supply

Infrastructure

Water Supply

Reliable, high-volume water supply sourced from the regional water authority (PDAM) with a dedicated deep-well backup system, ensuring uninterrupted supply for all industrial activities 24 hours a day.

Source
PDAM + deep-well backup
Capacity
5,000 m³/day (expandable)
Pressure at Connection
3–5 bar
Water Quality
Meets Permenkes No. 32/2017
Connection
Individual metering per lot, 3-inch pipe
Availability
24/7

Connectivity

Fiber Optic

Enterprise-grade fiber optic network covering the entire estate with multi-provider redundancy, ensuring tenants have access to high-speed, low-latency internet connectivity at all times.

Bandwidth
Up to 1 Gbps dedicated per tenant
Network Type
Metro Ethernet, FTTH
Providers
Multiple licensed ISPs (redundant)
Topology
Ring topology for high availability
SLA Uptime
99.9%
Coverage
Estate-wide, individual per lot
Fiber Optic
Natural Gas

Energy

Natural Gas

Direct pipeline access from PT Perusahaan Gas Negara (PGN) delivering a cost-effective, clean energy source ideal for manufacturing processes requiring continuous thermal energy.

Provider
PT Perusahaan Gas Negara (PGN)
Distribution Pressure
Medium pressure (≤ 4 bar)
Metering
Individual smart meter per lot
Pipeline Standard
HDPE & carbon steel, ASME B31.8
Billing
Direct to PGN, monthly
Availability
24/7 continuous supply

Environment

Waste Water Treatment

A centralised wastewater treatment plant (WWTP) handles industrial effluent from all tenants, processing it to meet government environmental discharge standards before release.

Treatment Capacity
3,000 m³/day
Process
Biological (activated sludge) + physical-chemical
Effluent Standard
PerMenLHK P.68/2016
Monitoring
Continuous online (CEMS)
Sludge Handling
Dewatering + licensed B3 disposal
Reporting
Monthly to KLHK
Waste Water Treatment
Electric Power

Energy

Electric Power

A dedicated PLN substation inside the estate guarantees stable, sufficient power for heavy industrial operations, with emergency backup coverage for common areas.

Provider
PT PLN (Persero)
Substation
Dedicated 150/20 kV inside estate
Total Capacity
60 MVA (expandable)
Distribution Voltage
20 kV, stepped down per lot
Metering
Individual AMR meter per lot
Backup
Diesel genset for common areas

Access

Road System

Wide, heavy-duty internal roads are designed for unobstructed movement of large industrial vehicles, container trucks, and logistics fleets throughout the estate at all times.

Main Road Width
20 meters (2 × 2 lanes)
Secondary Road Width
12 meters
Axle Load Capacity
30 tonnes
Surface
Rigid pavement, K-350 reinforced concrete
Drainage
Complete stormwater system on both sides
Street Lighting
LED, estate-wide
Road System

Build Your Future at
Lion Industrial Park

Strategic location. Complete infrastructure. Ready to build.

Copyright © 2026 Lion Industrial Park, All Right Reserved.

PT. Singa Purwakarta Jaya — Purwakarta, West Java